Wuyang Automation member company · Stock code 300420 Automated parking engineering for global projects
Plan a project ↗

Buyer guide

Automated parking project RFQ checklist.

Give the engineering team enough information to propose a buildable direction.

A useful RFQ describes both the site and operation.

Include location, required spaces, survey and drawings, building use, vehicle mix, peak demand, opening date, applicable codes, operating model and service expectations.

Planning priorities

Include location, required spaces, survey and drawings, building use, vehicle mix, peak demand, opening date, applicable codes, operating model and service expectations.

Site inputs Survey, footprint, levels and structure
Operating inputs Capacity, vehicle mix and peak demand
System inputs Entry cabins, movement path and redundancy
Delivery inputs Codes, interfaces, schedule and service

Frequently asked questions

What information is needed for an initial concept?

Location, target capacity, site or building drawings, vehicle mix, peak demand and project schedule.

Can the system be customized?

Configuration depends on site geometry, operating targets, applicable codes and verified equipment limits.

Project engineering

Start with your site.

Request a preliminary concept ↗