Planning priorities
Representative customer materials include commercial and office projects using plane-moving, vertical circulation and lift-slide configurations.
Site inputs
Survey, footprint, levels and structure
Operating inputs
Capacity, vehicle mix and peak demand
System inputs
Entry cabins, movement path and redundancy
Delivery inputs
Codes, interfaces, schedule and service
Frequently asked questions
What information is needed for an initial concept?
Location, target capacity, site or building drawings, vehicle mix, peak demand and project schedule.
Can the system be customized?
Configuration depends on site geometry, operating targets, applicable codes and verified equipment limits.