Planning priorities
Often compared to a Ferris-wheel motion path, the system rotates in the nearest direction for storage and retrieval. Traffic peaks and entry safety require careful planning.
Site inputs
Survey, footprint, levels and structure
Operating inputs
Capacity, vehicle mix and peak demand
System inputs
Entry cabins, movement path and redundancy
Delivery inputs
Codes, interfaces, schedule and service
Frequently asked questions
What information is needed for an initial concept?
Location, target capacity, site or building drawings, vehicle mix, peak demand and project schedule.
Can the system be customized?
Configuration depends on site geometry, operating targets, applicable codes and verified equipment limits.